 Canadian Natural Resources Ltd.
 
Wolf Lake SAGD 
 
Debottlenecking Study Rate trial, detailed debottlenecking study and final report for the expansion of the oil processing equipment of the Wolf Lake Heavy Oil facility located in the Bonnyville area of northern Alberta.
 
 
 Ranger Oil Limited
 
P-66A Wellsite Dehydration Facility
 
Engineering, procurement,, construction contract development and cost control for the installation of a 30 MMscfd high pressure, high acid gas dehydration facility, located in the Fort Liard area of the Northwest Territories.  
The facility was highly instrumented for remote control (via internet), along with all required utilities for a stand-alone system.  
Access to the wellsite was only available via an ice road; therefore timing of equipment delivery and construction was critical.
 Pioneer Natural Resources
 
Chinchaga Gas Development
 
Engineering, regulatory application, procurement, construction contract development and cost control for the expansion of an existing gathering system.  
This included the tie-in of 40 gas wells (high sand production) and facility inlet modifications.  
This also included the regulatory application to the National Energy Board (NEB) for an inter-provincial pipeline.
 
 AEC West Ltd. 
 
Grande Prairie Area Development
 
Engineering, regulatory application, construction contract development, cost control and field engineering support for the development and/or expansion of existing oil and gas wellsites and facilities. The tie-ins consisted of wellsite equipment for single & multi–well pads and associated pipelines. The facility development consisted of expansion and modification to plant inlet equipment to handle additional field production.
 
 Gulf Canada
 
Connorsville Shallow Gas Development
 
Engineering, construction contract development and support for the expansion of an existing shallow gas development. The gathering system expansion consisted of the tie-in of 160 wells along with the installation of 125 km of ploughed pipeline and 2 booster compressor stations.
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 